2100 Thurston Drive
Client
CCC No. 488
(20/20 Property Management)
Project Type
Localized Masonry Repairs
Project Challenges
Seasonal temperature challenges posed another layer of difficulty, as working with masonry materials during colder months can affect product performance. Ensuring that the repairs would be resilient in the face of ongoing weather changes was essential for longevity and cost-effectiveness.


Solutions Implemented
Key steps included:
- Localized Block Wall Joint Repointing: Targeted repointing addressed the areas most affected by wear and promotes protection of the underlying assembly components.
- Control Joint Replacement: To mitigate current and future movement issues, the team replaced deteriorated control joints in specific locations.
- Aerial Work Platform Access: Effective access to elevated areas enabled the team to handle high-up repairs securely and efficiently.
- Temporary Protection & Hoarding: Construction hoarding and protective barriers ensured a safe and contained work area, minimizing any disruption to the client’s operations.
Results & Client Satisfaction
Despite project complexities, CMG delivered a high-quality repair solution on schedule and within budget that enhanced the building’s integrity without sacrificing the original design. The client and building occupants now benefit from a restored, visually consistent building perimeter that aligns with building performance and longevity expectations.
“We’re pleased with the results and would highly recommend GroupCMG to anyone looking for reliable and quality construction services.”
— Kayla McKale (Condo Property Manager RCM, 20/20 Property Management)